Analog Devices
Cleanrooms & Advanced Technology
Milpitas, CA
Project Description
Convert existing office interior space to new raised test floor. The test floor will include new3’ deep trenches to provide conditioned air and process utilities through new trenches for future tools and equipment. The raised test floor included perforated HVAC grilles throughout. We included a new external chiller system on existing pad and trenched all CHW lines to the new test floor location. Roof mounted Make Up Air units with recirculating Air Fans in interstitial space. Furnished and installed floor mounted VAV HW reheat zones with DDC. Provided all new Title 24 electrical to meet code and additional power to meet new load.
- Size: 28,350 SF
- Design Team: SEG Engineers, Therma, RK Electric
- Project Type: Design Build, Raised Flooring, Perforated Floor Registers, Gordon Grid Ceiling System, Class 100 Cleanroom with 100% Coverage COBE